Skip to content
Author
PUBLISHED: | UPDATED:
Getting your Trinity Audio player ready...

This year’s long-planned construction start on the international space station was postponed Wednesday until late 1998 because Russia can’t meet its deadline for a vital segment.

A congressman who didn’t want Russia as a partner was quick to say, “I told you so.”

“I warned the administration that bringing the Russians into the program would force NASA to rob Peter to pay Paul when Russia caused delays and cost increases,” said Rep. F. James Sensenbrenner Jr. (R-Wis.), chairman of the House Science Committee.

The Russians, he said, have delivered “empty promise after empty promise, broken pledge after broken pledge, delay after delay.”

With U.S. funding, Russia built a space tug that will be the first of dozens of station elements to be assembled in orbit. That section is ready to go, as is the second segment built by the United States. But a crucial third element, a service module that was to house crews and provide steering capability, has not been started.

“Delivery of the service module has been delayed from April to December 1998,” Wilbur C. Trafton, the NASA associate administrator for space flight, told the House space subcommittee.

Therefore, he said, the first construction flight, scheduled for November, will be no later than October 1998. If Russia can’t fly the service module by December 1998, NASA will have substitute equipment ready.

“We didn’t know that bringing the Russians into the partnership would have these consequences,” said Trafton. He said that despite the delay, the space station should be completed and available for human occupancy on schedule in 2002.

The Russian failure comes in the face of intense diplomatic activity, conducted at the highest levels. Vice President Gore and Prime Minister Viktor Chernomyrdin have talked face-to-face about station progress a number of times. As late as February, Chernomyrdin promised Gore that Russia would give its space agency $100 million by Feb. 28 to work on the module.

NASA stressed the mutual advantage of cooperating with the station-experienced Russians, including five shuttle docking missions with the Mir space station and four Americans getting experience on board.

“We have been working with the Russians closely in space for three years,” NASA Administrator Daniel Goldin said. “There is value added for the American taxpayer through this approach but remember we never said it was going to be easy.”

Trafton said the United States would take $200 million from this year’s space shuttle reserves to pay for modifications–adding refueling capabilities to the space tug and modifying a Navy satellite as a temporary stand-in for some service module functions.

A cargo ship Tuesday brought critical repair gear to an American astronaut and two cosmonauts aboard the aging Mir space station, including fire extinguishers, oxygen generators and canisters to remove carbon dioxide from the air.

The 11-year-old orbiting space station was designed to last only five years, and in the past 1 1/2 months alone, NASA astronaut Jerry Linenger and his Russian colleagues have faced a fire, failed oxygen generators and leaking coolant loops that warmed the main living module to an uncomfortable 86 degrees.

The Progress-34 ship, which docked with Mir, brought three fire extinguishers to replace those used to put out a fire in February, as well as fuel, scientific equipment and parcels from family members, the ITAR-Tass news agency said in Moscow.

It also carried equipment to repair one of the station’s two oxygen-producing installations, which broke down last month.

Last week, the primary system to purge carbon dioxide overheated and had to be shut down, forcing the crew to rely on a backup air purification system. Before the cargo ship arrived, crew members had only an eight- to nine-day supply of the lithium-hydroxide purification canisters.